• 1

Post-Event Review Capability

The Post-Event Review Capability (PERC) methodology was created by Zurich Insurance to provide research and independent reviews of large flood events. It seeks to answer questions related to aspects of flood resilience, flood risk management and catastrophe intervention. It looks at what went well, as well as opportunities for improvement, and results in a set of recommendations for the future.

Use this page to learn about the PERC methodology, read full PERC reports or find specific recommendations.

PERC Reports

Using PERC methodology

Embed Code

Copy the given code snippet and paste in your website where you want to place our collection items

<iframe src="https://floodresilience.net/widget?module_id=220&tmpl=component&showembed=no&descsize=14&desclength=300" height="450" width="450" scrolling="yes" frameborder="0"></iframe>
The PERC manual

The PERC manual

The Post-Event Review Capability (PERC) is a systematic framework for the analysis of a disaster...

Zurich’s Post-Event Review Capability: Global lessons for reducing risk and increasing resilience

Zurich’s Post-Event Review Capability:...

Impacts from disasters are getting worse. Yet after a disaster, there is rarely time to learn what...

Houston and Hurricane Harvey: a call to action

Houston and Hurricane Harvey: a call to...

Hurricane Harvey made landfall near Rockport, Texas on August 25, 2017 as a Category 4 storm. Over...

 

Filter by:

Language

  • English

DRM Cycle

  • Coping
  • Corrective Risk Reduction
  • Crisis Preparedness
  • Prospective Risk Reduction
  • Reconstruction

Theme

  • Assets and Livelihoods
  • Education
  • Food
  • Governance
  • Life and Health
  • Natural Environment
  • Transport and Communication
  • Waste
  • Water

Region

  • ASIA
  • AFRICA
  • EUROPE
  • THE AMERICAS

Country

  • Nepal
  • Morroco
  • Switzerland
  • United Kingdom
  • United States
  • Peru

Published Year

  • 2010
  • 2011
  • 2014
  • 2015
  • 2016
  • 2017

Flood Type

  • Coastal
  • Flash
  • River
  • Surface

Capitals

  • Physical
  • Human
  • Social
  • Financial
  • Natural

4Rs

  • Robustness
  • Redundancy
  • Resourcefulness
  • Rapidity

PERC Recommendations

Search all the PERC recommendations produced in all PERC reports. Refine your search using the criteria on the left.

Total: 127 results found

Flood Risk Management Governance: improve integrated flood risk management

While there is a general consensus that integrated flood risk management (IFRM) from source to mouth of an entire watershed is the most appropriate way to approach flood control, there is no general consensus as to ...